Goh Fong Earthwork & Construction Sdn Bhd

Intrinsicly evisculate emerging cutting edge scenarios redefine future-proof e-markets demand line

Gallery Posts

Office Maps

OUR PROJECTS

construction and architecture environmentally most responsible for any kinds of themes.

Completed State Department Complex Drainage Work

State Department Complex (Parcel C2S) - Drainage Work

  • Description: Comprehensive drainage infrastructure project for the government complex ensuring efficient water management.
  • Location: Johor Bahru, Malaysia
  • Client: Hamidah Fazilah Sdn Bhd
  • Duration: Jun 2007 – Jan 2008
Completed New CIQ JB Drainage Work

New CIQ, JB - Drainage Work

  • Description: Advanced drainage system installation at the border CIQ complex supporting critical infrastructure.
  • Location: Johor Bahru, Malaysia
  • Client: Mentega Maintenance Sdn Bhd
  • Duration: Oct 2007 – Dec 2007
Completed New CIQ JB Drainage Work

New CIQ, JB - Drainage Work (Nam Fatt)

  • Description: Strategic drainage works at the CIQ complex in partnership with Nam Fatt, delivering high-quality stormwater management solutions.
  • Location: Johor Bahru, Malaysia
  • Client: Nam Fatt Construction Sdn Bhd
  • Duration: Nov 2007 – Sept 2008
Completed Indian Temple Site Clearing

Indian Temple, Kempas - Site Clearing

  • Description: Professional site clearing and preparation for temple construction, handling sensitive land preparation with precision and respect.
  • Location: Kempas, Malaysia
  • Client: Persatuan Penganut Dewa Sri Bahthi Durgai Auman
  • Duration: May 2009
Completed The Seed Swimming Pool Excavation

The Seed - Excavation Work of Swimming Pool

  • Description: Precision excavation work for swimming pool construction at The Seed development project.
  • Location: Malaysia
  • Client: Asiapools (J) Sdn Bhd
  • Duration: Apr 2011 – Jan 2012
Completed Demolishing Work

Demolishing Work

  • Description: Professional demolition services for building removal and site preparation.
  • Location: Malaysia
  • Client: HH Construction Sdn Bhd
  • Duration: Jun 2012
Completed Pile Cap & Ground Beam

Pile Cap & Ground Beam

  • Description: Foundation work including pile cap and ground beam construction for structural support.
  • Location: Malaysia
  • Client: Eterbilt Construction Sdn Bhd
  • Duration: Jan 2013
Completed New Roofing Replacement

New Roofing Replacement

  • Description: Complete roofing replacement and installation services for building renovation.
  • Location: Malaysia
  • Client: Mega Confectionery Sdn Bhd
  • Duration: Apr 2013
Completed Taman Perling Site Clearing

Taman Perling - Site Clearing & Infrastructure Works

  • Description: Comprehensive site clearing and infrastructure development works for residential development project.
  • Location: Johor Bahru, Malaysia
  • Client: Harapan Ramai Sdn Bhd
  • Duration: Jun 2012 – Mar 2007
Completed Factory Building Infrastructure Works

Proposed Factory Building at Lot 902 & 903, Mukim Jeram Batu, Ulu Choh, Pontian, Johor

  • Description: Factory building construction with comprehensive infrastructure works including site development and utilities.
  • Location: Ulu Choh, Pontian, Johor
  • Client: Reaplite Industry Sdn Bhd
  • Duration: May 2013 – Sept 2007
Completed Road Construction Felda Redong to Selancar

Construction and Completion of Road from Felda Redong to Selancar, Segamat, Johor

  • Description: Construction and completion of abandoned road project including site clearing, earthworks, drainage, pavement, and bridge structures.
  • Location: Felda Redong to Selancar, Segamat, Johor
  • Client: Reaplite Industry Sdn Bhd
  • Duration: Apr 2007 – Feb 2016
Completed New 4-Lane Road from FT92 to Pularek

New 4-Lane 2-Way Road from FT92 to Pularek Kota Tinggi, Johor

  • Description: Construction of new dual carriageway road including site clearing, earthworks, geotechnical works, surface water drainage, and reinforced concrete bridge structures.
  • Location: FT92 to Pularek, Kota Tinggi, Johor
  • Client: Reaplite Industry Sdn Bhd
  • Duration: May 2015 – Jul 2017
Completed Sungai Plentong Bridge Replacement

Sungai Plentong Bridge Replacement at Jalan Masai Lama, Johor Bahru

  • Description: Replacement of existing bridge structure at Sungai Plentong including demolition and reconstruction works.
  • Location: Jalan Masai Lama, Johor Bahru
  • Client: Reaplite Industry Sdn Bhd
  • Duration: Oct 2016 – Sept 2018
Completed Sealife Legoland Centre Earthwork

Sealife Legoland Centre, Johor Bahru, Johor

  • Description: Earthwork and site preparation for Sealife Legoland Centre development project.
  • Location: Johor Bahru, Johor
  • Client: Sunray & Interior Sdn Bhd
  • Duration: May 2017 – Dec 2017
Completed Mighty White Bakery Earthwork

Mighty White Bakery at Desa Cemerlang

  • Description: Earthwork and site preparation for bakery facility construction.
  • Location: Desa Cemerlang, Malaysia
  • Client: Mighty Bakery Sdn Bhd
  • Duration: Nov 2018 – Jan 2019
Completed Roadmarking at Tanjung Langsat

Roadmarking at Tanjung Langsat, Johor

  • Description: Road marking and traffic line painting services for industrial area.
  • Location: Tanjung Langsat, Johor
  • Client: Kemantra Sdn Bhd
  • Duration: Nov 2018
Completed Temple Renovation Taman Mount Austin

Renovation Temple at Taman Mount Austin

  • Description: Temple renovation and refurbishment works including structural improvements and finishing.
  • Location: Taman Mount Austin, Johor
  • Client: Persatuan Akhlak Chin Nam Kok
  • Duration: Oct 2018 – Nov 2018
Completed Mall Of Medini Modification and Parking

Proposed Modification Of Anchor Tenant, Construction of Additional Parking at Mall Of Medini (Phase 1)

  • Description: Modification of anchor tenant space and construction of additional parking facilities with related works for commercial development.
  • Location: Iskandar Puteri, Johor Bahru, Johor
  • Client: Brightcon Sdn Bhd
  • Duration: Dec 2018 – Mar 2019
Completed Residential Development Bandar Dato Onn

Residential Development at Lot PTD 84134, Bandar Dato Onn, Johor Bahru

  • Description: Residential development project including site clearing, earthworks, drainage systems, RC retaining walls, and related infrastructure works.
  • Location: Bandar Dato Onn, Mukim Tebrau, Johor Bahru, Johor
  • Client: Hong Xin Construction Sdn Bhd
  • Duration: Sep 2018 – Jan 2020
Completed Senai Airport City Development Drainage

Proposed Senai Airport City Development - Drainage Work (Sub-Labour Only)

  • Description: Drainage infrastructure works for Senai Airport City development project providing sub-labour services.
  • Location: Johor Bahru, Johor
  • Client: Excelgenic Sdn Bhd
  • Duration: Jul 2019 – Dec 2019
Completed Residential Development Bandar Dato Onn Drainage

Residential Development at Lot PTD 84134, Bandar Dato Onn - Drainage Work

  • Description: Drainage works including supply of machinery and manpower for mixed residential development project.
  • Location: Lot PTD 84134, Bandar Dato Onn, Mukim Tebrau, Daerah Johor Bahru, Johor
  • Client: Woon Brothers Construction Sdn Bhd
  • Duration: Sep 2020 – Dec 2020
Completed Road and Drain Works Bakery Factory

Proposed Road and Drain (External) for Bakery Factory Complex at Kawasan Perindustrian Puncak

  • Description: External road and drainage works for bakery factory complex development.
  • Location: Lot 293, Jalan Indah Gemilang, Kawasan Perindustrian Puncak, Mukim Plentong, Johor Bahru, Johor
  • Client: Mighty Bakery Sdn Bhd
  • Duration: Nov 2020 – Apr 2021
Completed Renovation Lorry Parking Tampoi

Renovation for Lorry Parking, Kawasan Perindustrian Tampoi

  • Description: Renovation and improvement works for lorry parking facility at industrial area.
  • Location: Kawasan Perindustrian Tampoi, Johor Bahru, Johor
  • Client: First City Sdn Bhd
  • Duration: Nov 2020 – Jan 2021
Completed Drainage Installation Eastern World

Supply and Install Drainage for Eastern World (M) Sdn Bhd

  • Description: Drainage supply and installation works for industrial facility.
  • Location: Malaysia
  • Client: Eastern World Sdn Bhd
  • Duration: Nov 2020 – Jan 2021
Completed Infrastructure Works Vermi Industries

Guard House, Temple, Roadwork, Drainage Work, Fence and Gate, Weighing Bridge Structure

  • Description: Comprehensive infrastructure works including guard house, temple, roadwork, drainage, fencing, gates, and weighing bridge structure.
  • Location: Malaysia
  • Client: Vermi Industries Sdn Bhd
  • Duration: Dec 2020 – Dec 2021
Completed Residential Development Mukim Senai Sewerage

Residential Development at Mukim Senai, Kulai - Sewerage Work

  • Description: Sewerage works including supply of manpower and machinery for residential development project.
  • Location: PTD 107557 - PTD 107995, Mukim Senai, Daerah Kulai, Johor
  • Client: Keen Fong Construction
  • Duration: Apr 2021
Completed Concrete Slab Repair Mighty Bakery

Construct and Completion Repair Work (Concrete Slab)

  • Description: Construction and completion of concrete slab repair works for industrial facility.
  • Location: Malaysia
  • Client: Mighty Bakery Sdn Bhd
  • Duration: May 2021
Completed Concrete Slab Repair Ng Ming Huat

Construct and Completion Repair Work (Concrete Slab)

  • Description: Construction and completion of concrete slab repair and renovation works.
  • Location: Malaysia
  • Client: Ng Ming Huat Sdn Bhd
  • Duration: Jul 2021
Completed Renovation Work Mighty Bakery

Renovation Work (Johor)

  • Description: Comprehensive renovation and refurbishment works for industrial facility.
  • Location: Johor, Malaysia
  • Client: Mighty Bakery Sdn Bhd
  • Duration: Sep 2021 – Jun 2022
Completed Concrete Slab Repair Mighty Bakery Selangor

Construct & Completion Repair Work (Concrete Slab)

  • Description: Construction and completion of concrete slab repair works.
  • Location: Selangor, Malaysia
  • Client: Mighty Bakery Sdn Bhd (Selangor)
  • Duration: Apr 2022 – Jun 2022
Completed Road Upgrade Jalan Gelang Patah Geotechnical

Road Upgrade from 2-Lane to 4-Lane Dual Carriageway at Jalan Gelang Patah (J4) - Geotechnical Work

  • Description: Geotechnical works for road upgrade project from single carriageway to dual carriageway.
  • Location: Jalan Gelang Patah (J4), from Kompleks Gelang Patah to Lebuhraya Tanjung Pelepas, Johor
  • Client: Dekad Jitu Sdn Bhd
  • Duration: Jun 2022 – Oct 2024
Completed Silt Fence Installation Jalan Gelang Patah

Road Upgrade at Jalan Gelang Patah - Supply Labour for Installation of Silt Fence

  • Description: Supply of labour for installation of silt fence as part of road upgrade project.
  • Location: Jalan Gelang Patah (J4), Johor
  • Client: Dekad Jitu Sdn Bhd
  • Duration: Sep 2022 – Nov 2022
Completed Slope Collapse Repair Desa Perindustrian Kulai

Repair Slope Collapse on Jalan Tembaga, Desa Perindustrian Kulai

  • Description: Construction, completion and maintenance of repair works for collapsed slope at industrial area.
  • Location: No. 6, Jalan Tembaga, Desa Perindustrian Kulai, 81000, Kulai
  • Client: Cheng Yew Heng Manufactory Sdn Bhd
  • Duration: Dec 2022 – Jan 2023
Completed Renovation Repair Work Mighty Bakery

Renovation & Repair Work

  • Description: Renovation and repair works for industrial facility.
  • Location: Malaysia
  • Client: Mighty Bakery Sdn Bhd
  • Duration: Dec 2022
Completed Box Culvert Maintenance Jalan Gelang Patah

Maintenance of Box Culvert Cover & Paving Works at J004, Jalan Gelang Patah-Pendas

  • Description: Maintenance works for box culvert cover and paving works at road infrastructure.
  • Location: J004, Jalan Gelang Patah-Pendas, Johor
  • Client: Fine Art Construction
  • Duration: Jan 2023
Completed Road Upgrade Jalan Gelang Patah Drainage

Road Upgrade at Jalan Gelang Patah (J4) - Drainage Work

  • Description: Drainage works for road upgrade project from single carriageway to dual carriageway.
  • Location: Jalan Gelang Patah (J4), from Kompleks Gelang Patah to Lebuhraya Tanjung Pelepas, Johor
  • Client: Dekad Jitu Sdn Bhd
  • Duration: Mar 2022 – Oct 2024
Completed Biopolis Tower Singapore Precast

Biopolis Tower, Singapore - Supply Labour for Precast Work

  • Description: Supply of labour for precast construction works for high-rise development project.
  • Location: Singapore
  • Client: Green E&C Sdn Bhd
  • Duration: Feb 2023 – May 2023
Completed Industrial Complex Infrastructure Kota Tinggi

Infrastructure Work for Heavy Industrial Factory Complex at Kota Tinggi

  • Description: Comprehensive infrastructure works including roadwork, drainage, sewerage, and water reticulation with supply of manpower, machinery and materials.
  • Location: Lot 89, Mukim Kota Tinggi, Daerah Kota Tinggi, Johor
  • Client: G-Cast Concrete Sdn Bhd
  • Duration: May 2023 – Oct 2023
Completed Road Repair Mighty White Factory Balakong

Road Repair Works Mighty White Factory at Balakong (Repair Concrete Slab)

  • Description: Road repair works including concrete slab repair for factory facility.
  • Location: Balakong, Selangor
  • Client: Mighty Bakery Sdn Bhd (Selangor)
  • Duration: May 2023
Completed Senai Airport City Drainage Phase 2

Proposed Senai Airport City Development Phase 2 - Drainage Works

  • Description: Drainage works from Jalan SAC 2 to Main Drain 12 (approximately 600m length) for airport city development.
  • Location: Senai Airport City, Mukim Tebrau, Johor Bahru, Johor
  • Client: Senai Airport City Sdn Bhd
  • Duration: Feb 2024 – Aug 2024
Ongoing Senai Airport City Bridge Crossing

Proposed Senai Airport City Development - Bridge Crossing at Sungai Tebrau

  • Description: Construction of bridge crossing over Sungai Tebrau for airport city development project.
  • Location: Senai Airport City, Mukim Tebrau, Johor Bahru, Johor
  • Client: Senai Airport City Sdn Bhd
  • Duration: Aug 2024 – Ongoing
Prev Next